Posts

The Padma Bridge

Image
Padma bridge : Padma Bridge, the largest bridge in Bangladesh is built by the Government of Bangladesh with its own funding. The construction of Padma Bridge started on 26 November 2014. And that work as completed on June 22 of this year. It took 90 Months 27 days or 2 thousand 765 days or 7years 6Months 27 days to complete the construction of the bridge. Padma Bridge location and origin:  Padma Bridge is long time dream of the people of southern part   Bangladesh A multipurpose road and rail bridge built over the Padma river.  Through this, Shariatpur and Madaripur districts have been connected with Lauhjong of MunshiGanj. The bridge was inaugurated on 25 June 2022. Information the construction of  Padma bridge:  The foundation stone of Padma Bridge was laid on 24 July 2009.The length of Padma Bridge is 6.15km its width is 18.1 meters. The height of Padma Bridge is 13.6 meters. The height from the water level of Padma Bridge is 60 feet. The road connection of Padma bridge is 14km. Pad